Söderströmstunneln, ITT Foundations
To reduce congestion and increase the capacity on Stockholm’s local and regional rail network, a 6 km long underground railway line has been constructed beneath
To reduce congestion and increase the capacity on Stockholm’s local and regional rail network, a 6 km long underground railway line has been constructed beneath
Proserve’s pile jacket system was used to provide 100 mm thick insitu concrete encasement to 29 N° 2 m diameter reinforced concrete bridge piers, filling
Flooding in Venice will soon become a thing of the past with the help of MOSE barrage project. This is currently being constructed to the
Pan Mediterranean Engineering Company (PMEC), a unit of China Harbour, is undertaking construction of the new Hadarom Port Project in the Port of Ashdod, Israel.
The concrete caisson breakwater extension at Pittenweem had suffered base underscour and failure of the foundation bedding stone, causing settlement of caisson 3 of some
The HSS berth at Belfast Harbour was moved seaward to Victoria Terminal 4 in 2008 to reduce the crossing times to Scotland. Significant bed protection
The stonework gravity walls to the historic dock basin were suffering from face failure underwater due to loss of its original weak lime mortar. An
The Bulk Jetty was built in 1950. The steel piles to the jetty where in such a poor condition with many piles holed through corrosion
Cardiff Bay is a sheltered inlet covering about 200 hectares on the Bristol Channel at the mouths of the Rivers Taff and Ely. The Cardiff
The Second Severn Crossing comprises a 5.2 km crossing of the Severn Estuary between Severn Beach and New Passage. The crossing itself consists of a