Grand Canal, Dublin, Wall Repair
The stonework gravity walls to the historic dock basin were suffering from face failure underwater due to loss of its original weak lime mortar. An
The stonework gravity walls to the historic dock basin were suffering from face failure underwater due to loss of its original weak lime mortar. An
The Bulk Jetty was built in 1950. The steel piles to the jetty where in such a poor condition with many piles holed through corrosion