Romania, Pile Repairs
Proserve’s pile jacket system was used to provide 100 mm thick insitu concrete encasement to 29 N° 2 m diameter reinforced concrete bridge piers, filling
Romania, Pile Repairs Read More »
Proserve’s pile jacket system was used to provide 100 mm thick insitu concrete encasement to 29 N° 2 m diameter reinforced concrete bridge piers, filling
Romania, Pile Repairs Read More »
The Bulk Jetty was built in 1950. The steel piles to the jetty where in such a poor condition with many piles holed through corrosion
Dublin Port, Pile Repairs Read More »