Construction of Piled Quays using the Land Infill Method

M. Hawkswood and G. Hawkswood, (2023)
PIANC America April 24-27, Fort Lauderdale, Florida, USA

The Land Infill construction method for open piled quays is outlined, which offers savings in time and cost during construction. The use of insitu concrete mattress slope protection, which can be installed below the deck enables the use of the Land Infill method. Where piled quays are constructed by traditional marine methods, concrete mattress installation below the deck can also be used to save time.